• DMCA
  • Disclaimer
  • Privacy Policy
  • Cookie Privacy Policy
  • Terms and Conditions
  • Contact us
Inter Space Sky Way
  • Home
  • Alien
  • UFO
  • Space
  • NASA
  • Space Flight
  • Astronomy
No Result
View All Result
  • Home
  • Alien
  • UFO
  • Space
  • NASA
  • Space Flight
  • Astronomy
No Result
View All Result
Inter Space Sky Way
No Result
View All Result
Home NASA

Huge House now goals for 2026 launch of Haven-1 area station module after key milestone (pictures)

February 8, 2025
in NASA
57 5
0
Huge House now goals for 2026 launch of Haven-1 area station module after key milestone (pictures)
74
SHARES
1.2k
VIEWS
Share on FacebookShare on Twitter


Huge House is taking large steps towards placing the primary industrial area station in orbit.

The California-based startup lately accomplished a significant testing milestone for the qualification vessel of its upcoming Haven-1 station, a benchmark Huge additionally used to reevaluate the launch date for the corporate’s first flight-ready module.

“With the completion of our main construction qualification check and a totally assembled staff, we now have higher readability on our construct and launch schedule. In consequence, we’re updating our timeline,” Huge stated in a statement.

Haven-1 will journey a SpaceX Falcon 9 rocket to low-Earth orbit — a mission that was initially slated for this August. Now, Huge expects Haven-1 to launch no sooner than Could 2026.

Even with the delay, it is nonetheless an “bold timeline,” the corporate stated. However Huge stays optimistic: “If all goes as deliberate, we can have designed, constructed, and launched the world’s first industrial area station in three years — a tempo by no means earlier than achieved in human spaceflight.”

Huge started manufacturing the Haven-1 qualification article at its Lengthy Seashore headquarters in July 2024 and transported the module to the corporate’s check stand in Mojave, California, final month. There, the module started a collection of campaigns to qualify the module’s structural integrity. These campaigns are ongoing, however one handed lately was a big hurdle for the module’s continued growth.

Utilizing dry nitrogen, Huge pressurized the module on the check stand twice — the primary for a length of 5 hours, and the second for 48 hours. In line with the corporate’s information, Haven-1’s stress sensors confirmed an “indiscernible” leak fee, exceeding the vessel’s necessities and falling inside compliance for NASA’s crew-rated spacecraft {qualifications}.

Breaking area information, the newest updates on rocket launches, skywatching occasions and extra!

Picture 1 of 4

A man in a grey long-sleeve shirt and ginger hair faces away, looking up with his left hand holding the hatch at the end of a large white conical vessel with a gridded latus around its exterior.
A Huge House Technician inspects the ahead hatch of the Haven-1 qualification module.(Picture credit score: Huge House)

A man stands above a domed pane of glass with a wire in secured with yellow tape at its center in the shape of a spiral. The dome is secured by metal sheets of a space module.
A Huge House technician inspects Haven-1’s domed window.(Picture credit score: Huge House.)

The conical bottom of a white space module is suspended in the desert against a bright blue sky, next to tall stacks of scaffolding.
Haven-1 is lifted into the Huge House check stand in Mojave, CA.(Picture credit score: Huge House)

A large group of people kneel and stand in three-ish rows, in front of a large white space station module, laid on its side in a large factory.
Huge staff forward of transport out Haven-1 main construction qualification article to the Mojave, CA check web site(Picture credit score: Huge House)

That final bit is necessary. Huge is hoping to win the bid for NASA’s Business LEO Vacation spot (CLD) contract in 2026, and needs to place itself forward of the competitors.

You might also like

Area.com headlines crossword quiz for week of Nov. 17, 2025: What does the I in comet 3I/ATLAS stand for?

Canon 8×20 IS binocular evaluate

A ‘rampaging lion’ nebula roars to life in a surprising deep-space picture

With the Worldwide House Station (ISS) approaching retirement on the finish of 2030, NASA has been anticipating firms to get industrial area stations up and operating. Certainly, almost half a dozen different non-public contenders have voiced plans to assemble their very own LEO locations — specifically, Northrop Grumman, Axiom House, Nanoracks and Sierra House.

As these firms tread water whereas they gauge market demand or proceed their station developments within the background, Huge says it is on observe to get Haven-1 to orbit in file time, and has begun actively searching for out prospects and scientists with analysis they need to fly to area.

a white cylindrical vessel with conical top is mounted to stand on a test area, surrounded by railed scaffolding.

Huge’s Haven’-1 qualification article on the check stand in Mojave, CA. (Picture credit score: Huge House)

Within the weeks forward, the check module can be submitted to simulated launch pressures utilizing hydraulic actuators on the Mojave check stand, in addition to endure structural load assessments whereas beneath stress.

Even because the qualification article started its check marketing campaign on the finish of final month, Huge was already manufacturing the Haven-1 flight automobile — the one going to area. Matching the six-month tempo the qualification module took from manufacturing to its assessments in Mojave, Huge goals to finish the first construction for the flight module by July of this yr. The corporate’s full timeline, from now by way of the primary crewed mission to Haven-1 is as follows:

Swipe to scroll horizontally
Huge House Haven-1 Timeline
Milestone Description Goal Date
Flight Major Construction Full manufacturing and testing of the flight main construction July 2025
Integration Car integration and checkout, together with subsystem manufacturing and testing July 2025 – December 2025
Built-in Car Testing Environmental check marketing campaign (acoustics, vibration, EMI, TVAC) Jan 2026 – March 2026
Launch Marketing campaign Begin Pre-launch operations on the launch web site April 2026 – Could 2026
Launch Haven-1 launch NET Could 2026
Automated-Orbit Operations System commissioning in orbit Could – June 2026
First Crewed Mission First crewed mission NET Finish of June 2026

modules of a space station float together above Earth.

Haven-2 is poised to succeed the Worldwide House Station. (Picture credit score: Huge House)

As soon as Haven-1 is operational in orbit, Huge plans to launch a four-person crew to the outpost aboard a SpaceX Crew Dragon. That mission will final about two weeks, because the astronauts try the station’s programs and habitability.

Wanting forward even additional, Huge has already unveiled its plans for Haven-2, a second module design that can dock with Haven-1 to extend the area station’s capability and capabilities. Huge is at the moment concentrating on 2028 for the primary Haven-2 launch, with plans to so as to add to the modular station by way of 2032 to finally exceed the present capabilities of the ISS.



Source link

Tags: AimsHaven1KeylaunchmilestonemodulephotosspaceStationVast
Share30Tweet19

Recommended For You

Area.com headlines crossword quiz for week of Nov. 17, 2025: What does the I in comet 3I/ATLAS stand for?

by Chato80
November 24, 2025
0
Area.com headlines crossword quiz for week of Nov. 17, 2025: What does the I in comet 3I/ATLAS stand for?

Each week, Area.com delivers the most recent discoveries, launches, and cosmic curiosities from throughout the universe. From groundbreaking analysis aboard the Worldwide Area Station to dazzling new pictures...

Read more

Canon 8×20 IS binocular evaluate

by Chato80
November 23, 2025
0
Canon 8×20 IS binocular evaluate

The Canon 8x20 IS binoculars fall nearly into the compact binocular class. At simply 14.82 oz (420 g) with out the battery, they're Canon’s lightest picture stabilized binoculars...

Read more

A ‘rampaging lion’ nebula roars to life in a surprising deep-space picture

by Chato80
November 22, 2025
0
A ‘rampaging lion’ nebula roars to life in a surprising deep-space picture

The Lion Nebula as captured by astrophotographer Ronald Brecher in October 2025. (Image credit: Ronald Brecher)A nebula takes on the appearance of a rampaging lion in a new...

Read more

Week Wraps with Fluid Physics, Stem Cell Analysis as New Crew Preps Start

by Chato80
November 22, 2025
0
Week Wraps with Fluid Physics, Stem Cell Analysis as New Crew Preps Start

Expedition 73 wrapped up the work week persevering with to check fluid physics and stem cells, making ready for subsequent week’s new crew arrival, and unpacking a U.S....

Read more

How did this 20-light-year-wide ‘Diamond Ring’ type in house? Perhaps a cosmic bubble burst

by Chato80
November 21, 2025
0
How did this 20-light-year-wide ‘Diamond Ring’ type in house? Perhaps a cosmic bubble burst

A distant, mysterious glowing ring of fuel and mud has lastly given up its secrets and techniques — and it seems to be much less of a romantic...

Read more
Next Post
Is Methane the Key to Discovering Life on Different Worlds?

Is Methane the Key to Discovering Life on Different Worlds?

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Browse by Category

  • Alien
  • Astronomy
  • NASA
  • Space
  • Space Flight
  • UFO

Recent News

NASA Lastly Releases Pictures of 3I/ATLAS Taken by Its Missions at Mars

NASA Lastly Releases Pictures of 3I/ATLAS Taken by Its Missions at Mars

November 24, 2025
Blue Origin to Construct a “Tremendous Heavy” Rocket to Compete with Starship

Blue Origin to Construct a “Tremendous Heavy” Rocket to Compete with Starship

November 24, 2025
Webb discovers quickly rising black gap within the very early universe

Webb discovers quickly rising black gap within the very early universe

November 23, 2025
UFOs-Disclosure: What Aliens Consider Our Civilization Proper Now

UFOs-Disclosure: What Aliens Consider Our Civilization Proper Now

November 24, 2025
SpaceX launches 28 Starlink satellites on new Falcon 9 rocket from California

SpaceX launches 28 Starlink satellites on new Falcon 9 rocket from California

November 23, 2025
Area.com headlines crossword quiz for week of Nov. 17, 2025: What does the I in comet 3I/ATLAS stand for?

Area.com headlines crossword quiz for week of Nov. 17, 2025: What does the I in comet 3I/ATLAS stand for?

November 24, 2025
  • DMCA
  • Disclaimer
  • Privacy Policy
  • Cookie Privacy Policy
  • Terms and Conditions
  • Contact us
INTER SPACE SKY WAY

Copyright © 2023 Inter Space Sky Way.
Inter Space Sky Way is not responsible for the content of external sites.

No Result
View All Result
  • Home
  • Alien
  • UFO
  • Space
  • NASA
  • Space Flight
  • Astronomy

Copyright © 2023 Inter Space Sky Way.
Inter Space Sky Way is not responsible for the content of external sites.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In