• DMCA
  • Disclaimer
  • Privacy Policy
  • Cookie Privacy Policy
  • Terms and Conditions
  • Contact us
Inter Space Sky Way
  • Home
  • Alien
  • UFO
  • Space
  • NASA
  • Space Flight
  • Astronomy
No Result
View All Result
  • Home
  • Alien
  • UFO
  • Space
  • NASA
  • Space Flight
  • Astronomy
No Result
View All Result
Inter Space Sky Way
No Result
View All Result
Home NASA

What Occurred at Artemis-2 Moist Gown Rehearsal, and What’s Subsequent

February 5, 2026
in NASA
60 2
0
What Occurred at Artemis-2 Moist Gown Rehearsal, and What’s Subsequent
74
SHARES
1.2k
VIEWS
Share on FacebookShare on Twitter


Launch and vacation spot, the total moon rising 230,000 miles away as Artemis-2 awaits moist costume rehearsal for launch. Photograph: AmericaSpace / Mike Killian

Artemis-2 moist costume rehearsal was the primary time the powered-up built-in fueled stack might discuss to NASA. Orion was configured for flight, the closeout crew safely closed the hatches & white room, the entry arm bridge retracted superb, the rocket was totally fueled, however a pesky hydrogen leak spiked to cutoff limits after they entered terminal countdown & pressurized the core stage.

In a news conference Feb 3, mission management mentioned they’ll repair the leak on the pad, so no rollback to the VAB is deliberate. The issue is on the tail service mast umbilical (TSMU) cavity, on the base of the rocket between the place the flight and floor plate come collectively.

TSMU related to SLS at pad 39B. Photograph: AmericaSpace / Mike Killian

The flight-side interface with the leak is advanced and delicate to circulate charges & pressures, & makes use of a pressure-assisted seal. Within the slow-fill part every thing was okay, however as they step by step elevated strain into fast-fill the leak began. They know the best way to handle it from Artemis-1, let the seal & interface get heat & alter strain to remain inside leak limits to get the tank full. NASA has a leak restrict cutoff of 16% for SLS. The leak ranged from 12-14%.

When ops entered Terminal Rely & pressurized the core stage, the leak rapidly spiked, stopping the countdown. It’s what WDR is for, testing every thing as will probably be on launch day and addressing points in order that they aren’t an issue when it’s time to do the actual factor.

Artemis-2 on pad 39B for moist costume rehearsal. Photograph: AmericaSpace / Jeff Seibert

Employees will entry the interface plate and have a look at the seal

The staff is now reviewing knowledge & investigating which bleed line is concerned. They should entry the interface plate & take away & examine the seal. There could also be a misalignment, a deformation or particles on the seal. 

Related leaks with Artemis-1 have been on the ground-side. Engineers made quite a few modifications & enhancements after. No leak occurred on that aspect for Artemis-2 WDR.

“After Artemis I, with the challenges we had with the leaks, we took a reasonably aggressive strategy to do some component-level testing with a few of these valves and the seals, to grasp their habits,” mentioned John Honeycutt, chair of the Mission’s Administration Workforce.

The complete moon excessive over Artemis-2. Photograph: AmericaSpace / Mike Killian

“We obtained an excellent deal with on that relative to how we set up the flight-side and the ground-side interface, however on the bottom, we’re fairly restricted in how a lot realism we will put into the take a look at. We attempt to take a look at like we fly, however it is a very advanced interface. Once you’re coping with hydrogen, it’s a small molecule. It’s extremely energetic.”

NASA thinks rollout could also be a contributing issue behind the leaks

Within the press convention, NASA famous that shifting the large rocket could also be an element behind the leak. There isn’t sufficient knowledge to show it, however the TSMU is mated to the stack throughout rollout. Engineers can’t totally characterize the setting & stresses from high to backside throughout these delicate strikes, the identical means they’ll predict stresses whereas on the pad. That’s one purpose why they by no means need to transfer the stack until they don’t have any alternative.

Artemis-2 rollout. Photograph: AmericaSpace / Jeff Seibert

Artemis-2 can keep on the pad by March, however past that it must rollback to the VAB so technicians can service the higher stage batteries. The cast-life on the SRBs is nice to 2028, & Orion’s CO2 scrubbing system is checked out to mid-2027. 

One of many large issues NASA hoped to do however couldn’t is get by terminal rely to T-0 (liftoff). The staff desires to confirm a 3-minute maintain functionality, demonstrating that the SLS cryo propellant programs can maintain in a launch-ready state. Additionally they need to execute a recycle the place they’ve a cutoff within the countdown and are available again to focus on a brand new T-0. Each might be achieved within the subsequent WDR.

March 6-9 and March 11 are the following launch alternatives.

Like this:

Like Loading…

You might also like

Watch lifeless neutron stars smash collectively in new NASA supercomputer simulation

Artemis II: WDR resolutions in work forward of March goal

Biomedical Analysis, CubeSat Deployments High Crew Schedule





Source link

Tags: Artemis2dressHappenedRehearsalwet
Share30Tweet19

Recommended For You

Watch lifeless neutron stars smash collectively in new NASA supercomputer simulation

by Chato80
February 4, 2026
0
Watch lifeless neutron stars smash collectively in new NASA supercomputer simulation

A brand new simulation created utilizing a NASA supercomputer has proven how issues get messy for merging neutron stars even earlier than they slam collectively; their magnetospheres, essentially...

Read more

Artemis II: WDR resolutions in work forward of March goal

by Chato80
February 4, 2026
0
Artemis II: WDR resolutions in work forward of March goal

Artemis II: WDR resolutions in work forward...

Read more

Biomedical Analysis, CubeSat Deployments High Crew Schedule

by Chato80
February 4, 2026
0
Biomedical Analysis, CubeSat Deployments High Crew Schedule

Biomedical analysis to maintain crews wholesome and CubeSat deployments for instructional analysis topped the science schedule aboard the Worldwide House Station on Tuesday. The Expedition 74 crew additionally...

Read more

Neutron star photobombs child star picture of the day for Feb. 3, 2026

by Chato80
February 3, 2026
0
Neutron star photobombs child star picture of the day for Feb. 3, 2026

In astronomy, appearances could be deceiving, particularly if you're objects which are each distant and complicated. Glowing clouds of gasoline are sometimes grouped below the catch-all time period...

Read more

Expedition 74 Kicks Off Week with Dragon Preps and Science Gear Work

by Chato80
February 3, 2026
0
Expedition 74 Kicks Off Week with Dragon Preps and Science Gear Work

The Expedition 74 crew kicked off the week with SpaceX Dragon spacecraft preparations and science {hardware} upkeep making certain analysis continues offering pristine outcomes aboard the Worldwide Area...

Read more
Next Post
Northrop Grumman assessments second strong motor developed beneath 2025 SMART program

Northrop Grumman assessments second strong motor developed beneath 2025 SMART program

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Browse by Category

  • Alien
  • Astronomy
  • NASA
  • Space
  • Space Flight
  • UFO

Recent News

It is time to consider human replica in area, scientists urge

It is time to consider human replica in area, scientists urge

February 5, 2026
Watch lifeless neutron stars smash collectively in new NASA supercomputer simulation

Watch lifeless neutron stars smash collectively in new NASA supercomputer simulation

February 4, 2026
Northrop Grumman assessments second strong motor developed beneath 2025 SMART program

Northrop Grumman assessments second strong motor developed beneath 2025 SMART program

February 5, 2026
What Occurred at Artemis-2 Moist Gown Rehearsal, and What’s Subsequent

What Occurred at Artemis-2 Moist Gown Rehearsal, and What’s Subsequent

February 5, 2026
Why NASA’s Artemis 2 Moon shot will slip to March

Why NASA’s Artemis 2 Moon shot will slip to March

February 4, 2026
The Aerospace Engineer Who Knew Too A lot About UFOs & Extremely Secret Alien Applications

The Aerospace Engineer Who Knew Too A lot About UFOs & Extremely Secret Alien Applications

February 4, 2026
  • DMCA
  • Disclaimer
  • Privacy Policy
  • Cookie Privacy Policy
  • Terms and Conditions
  • Contact us
INTER SPACE SKY WAY

Copyright © 2023 Inter Space Sky Way.
Inter Space Sky Way is not responsible for the content of external sites.

No Result
View All Result
  • Home
  • Alien
  • UFO
  • Space
  • NASA
  • Space Flight
  • Astronomy

Copyright © 2023 Inter Space Sky Way.
Inter Space Sky Way is not responsible for the content of external sites.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In