
SpaceX has accomplished multi-day catch-related testing with unflown Ship 42 at Pad 2, then rolled the automobile again to the manufacturing website for engine set up forward of Massey’s static hearth testing.
Flight 14 is now no sooner than September 22 in planning documentation, though SpaceX has not set an official goal. That mission shouldn’t be deliberate as a catch try, however a clear return for the Flight 14 automobiles may open the door to catches on Flight 15.
With Flight 14 {hardware} already via pre-flight testing, SpaceX has turned extra of its Starbase consideration to the following pair of automobiles: Ship 42 and Booster 22.
Ship 42 accomplished two cryogenic checks at Massey’s amid Booster 22’s personal marketing campaign, then returned to the manufacturing website earlier than rolling again to Massey’s on September 9 for another cryo check.
Throughout these checks, SpaceX masses the automobile with liquid nitrogen and liquid oxygen to simulate flight-like thermal circumstances and pressures.
On the cryo stand, a thrust simulator additionally induces masses within the aft part as flight Raptor engines would when lit, verifying structural integrity beneath real looking temperatures and pressures.
Booster 22 left the manufacturing website on September 8 and joined Ship 42 at Massey’s. After a sequence of cryogenic proof checks, the booster rolled again to Mega Bay 1 on September 12 to organize for engine set up forward of static hearth testing at Pad 2.
Booster 22 (Flight 15) is rolling out to Masseys for its preliminary spherical of cryogenic checks. @NASASpaceflight pic.twitter.com/UsDdNbjUHI
— Ceaser G (@CeaserG33) September 8, 2026
Ship 42 then made an uncommon journey to the launch website effectively earlier than it is able to fly. On September 12, it was rolled into the chopsticks and lifted into what gave the impression to be a simulated catch place on the prime of the Pad 2 tower.
Ship 42 is Flight 15 {hardware}, not the ship assigned to Flight 14, and it nonetheless lacked flight engines, pointing to a structural and interface check marketing campaign.
Within the hours that adopted, the chopsticks’ pins and arms had been labored towards the automobile, the chopsticks rotated west, and the ship was lowered to satisfy the short disconnect arm.
A number of small changes had been then made to the ship’s place and the ship fast disconnect (SQD) plate to raised align with the ship’s SQD port.
At the moment's Starship Ship 42 testing gave as a novel alternative, because the @NASASpaceflight Starbase Reside cameras captured the covers on the Ship Fast Disconnect plate being closed, because the arm moved away on the conclusion of that a part of testing. pic.twitter.com/TAqbTJDyw9
— Elisar Priel (@ENNEPS) September 12, 2026
The likeliest objective was to observe reconnecting the SQD arm to a caught ship so leftover propellant may be drained and the automobile safed earlier than it’s moved away from the pad.
After the SQD testing, the ship was raised again to the highest of the tower and rotated forwards and backwards. SpaceX saved it there for an prolonged interval, maybe to substantiate the chopsticks may maintain a ship if wanted after a catch.
The rotations themselves had been additionally notable. The sticks open broadly to provide a ship a bigger goal throughout catch, however last-minute corrections should still be required, and the power to translate a caught automobile gives margin if the ship is off-target.
Flight 8 provided a reminder of why that vary of movement issues. After the chopsticks closed on Booster 15, the booster was swung to the north facet of the pad for causes that stay unclear.
Shifting a automobile already within the sticks is clearly handled as a necessity, even when that earlier instance was a booster fairly than a ship.
As soon as this testing was full, Ship 42 was positioned again on its stand and rolled to the manufacturing website Saturday night time into Sunday morning to renew preflight operations, together with engine set up. It would then return to Massey’s for a static hearth.
The hum of the SPMTs, as Ship 42 heads again to the barn. The pic.twitter.com/DAuaRMB0xc
— NSF – NASASpaceflight.com (@NASASpaceflight) September 13, 2026
Each Booster 22 and Ship 42 stay no less than a number of weeks from flight readiness. Flight 14 remains to be subsequent, now NET September 22, and it isn’t deliberate as a catch try.
If that mission goes effectively, Flight 15 may come on a a lot shorter cadence, probably inside a month, and will put the chopsticks work seen with Ship 42 into operational use.
Featured Picture: Credit score: Colleen Leidke for NSF.
The put up Ship 42 wraps chopsticks checks, Flight 14 strikes to NET Sept. 22 appeared first on NASASpaceFlight.com.
