Blue Origin continues placing its first lunar lander by means of its paces, testing the spacecraft at NASA facilities throughout the nation to organize it for its upcoming mission to the moon.
That car, named “Endurance,” is Blue Origin’s uncrewed Blue Moon MK1 check lander, which is designed to pave the best way for the extra superior MK2 model that might be able to flying astronauts to the moon’s floor. Blue Moon is certainly one of two non-public lunar landers, from Blue Origin and SpaceX, that NASA has contracted to help its Artemis program, and each of these automobiles have a prolonged record of exams and {qualifications} to test off as a way to meet the company’s timeline.
Endurance recently completed vacuum chamber testing at NASA’s Johnson House Heart in Houston and was shipped to Blue Origin’s services close to Kennedy House Heart (KSC) in Florida final month. Now, the lander is being prepared for radio frequency compatibility testing inside the corporate’s Lunar Plant 1, to make sure the lander’s communication techniques will not expertise any interference earlier than flight.
📍 Lunar Plant 1 Testing in Florida continues for Endurance. Radio frequency compatibility testing is on deck. pic.twitter.com/PnXea1Z2rOMay 5, 2026
NASA is focusing on 2028 for the primary Artemis program moon touchdown on Artemis 4. Nonetheless, earlier than NASA certifies both Starship or Blue Moon to ship astronauts to the floor, each should full a collection of {qualifications}, together with an uncrewed lunar landing, which Blue Origin hopes to perform later this 12 months with Endurance. So as to pull off a profitable touchdown, the spacecraft may also must display autonomous navigation, cryogenic gasoline switch and extended storage, after which show its capacity to launch again into lunar orbit.
A part of Endurance’s touchdown mission will embrace two science demonstration payloads for NASA’s Industrial Lunar Payload Companies (CLPS) program, a side-by-side initiative with Artemis that companions with non-public trade to ship payloads to the moon to additional evolve the applied sciences wanted to help future long-term lunar habitation missions with astronauts.
Whether or not Endurance could make it to house earlier than the tip of 2026 depends on the way it fares within the exams forward, and whether or not Blue Origin encounters any anomalies alongside the best way. And, along with the prelaunch exams nonetheless forward for the MK1, the lander’s meant launch car, Blue Origin’s New Glenn rocket, is at present grounded pending an FAA investigation right into a second-stage failure throughout its most up-to-date mission.
Starship could have a leg up in its improvement timeline, with 11 check launches to house beneath its belt (and a twelfth anticipated in every week or so) already. However the SpaceX car hasn’t really flown a full orbit round Earth but, and it faces the identical record of to-dos as Blue Moon.
It is unclear to what extent NASA would require both lander’s improvement to have progressed as a way to qualify to fly on Artemis 3. For instance, the company hasn’t introduced whether or not or not the astronauts will enter the landers whereas in Earth orbit, or whether or not Orion will dock with the spacecraft in any respect, or just carry out proximity operations maneuvers round them.

